The Central Terminal Area (CTA) Distributed Antenna System (DAS) project involved the installation of a new fiber-optic backbone throughout the CTA and the deployment of fiber infrastructure and antennas within all LAX parking structures. The system was integrated with the concurrent Headend DAS project, creating a unified communications network designed to enhance wireless connectivity across the airport campus.
Our scope included installation of the fiber backbone, structured fiber infrastructure, and DAS antenna systems serving Parking Structures 1, 2A, 2B, 3, 4, 5, 6, and 7, as well as surrounding CTA areas. The completed system significantly improved 5G coverage and cellular service for passengers, visitors, airport personnel, and operational users throughout the Central Terminal Area.
All work was performed while the parking structures remained fully operational, requiring careful planning and coordination to minimize impacts to airport operations and public parking. The project was administered by Verizon, AT&T, and T-Mobile, with Blackwave and Delta Group Engineering serving as the designers and Azteca as the lead contractor.
You can contact our 24-hour electrical service and maintenance department at 818-970-1149 (Off hours). During the working hours, 8:00am to 5:00pm, please call 818-340-0965.