The Los Angeles International Airport (LAX) Central Utility Plant (CUP) Replacement Project involved demolishing the existing 50-year-old facility and constructing a new 90,000-square-foot steel-framed CUP with a 20,000-ton cooling capacity. The new plant enhances passenger comfort, utility reliability, and safety across the modernized terminals.
Our scope included installing a new electrical substation and retrofitting the existing LADWP substation, along with comprehensive electrical distribution upgrades throughout the Central Terminal Area (CTA). This involved replacing direct-buried chilled and hot water service lines and approximately 18 miles of pipe and duct bank housing electrical, communications, and utility systems. We also performed extensive low voltage installations, including structured cabling, fiber optics, fire alarm, paging, ACAMS, and CCTV systems.
Additional work included integrating new fire management and life safety systems, upgrading pump rooms and air handling equipment in multiple terminal locations, and installing new distribution piping beneath key airport roadways. The project also featured construction of a maintenance shop, offices, and a thermal energy storage tank.
The CUP was designed to meet stringent seismic criteria to ensure operational resilience, with provisions for future recycled water systems and biogas integration from the Hyperion Treatment Plant.
You can contact our 24-hour electrical service and maintenance department at 818-970-1149 (Off hours). During the working hours, 8:00am to 5:00pm, please call 818-340-0965.