The Headend DAS project provided a new central hub facility supporting wireless communications across all LAX terminals and parking structures. The facility houses one main IDF room and two auxiliary IDF rooms equipped with rectifiers that power the airport-wide DAS network, enhancing 5G coverage throughout the LAX campus.
Our scope included installation of a 2000kW emergency generator, a power connection to Terminal 8’s main electrical room, and a fiber optic backbone loop throughout the Central Terminal Area (CTA) to support reliable, system-wide connectivity.
The project was administered by Verizon, AT&T, and T-Mobile, designed by Blackwave and Delta Group Engineering, and constructed by Azteca as the lead contractor.