Comet Electric provided the electrical infrastructure required to support the deployment of a new Advanced Visual Docking Guidance System (AVDGS) at sixteen (16) gate locations across Terminals 4 and 5 at Los Angeles International Airport (LAX). The project was designed to enhance aircraft docking accuracy, improve gate efficiency, and support safe airside operations.
Our scope included furnishing and installing conduit pathways and associated infrastructure necessary to support the new AVDGS equipment. The work required careful coordination within active terminal and apron environments, including routing around existing utilities and operational constraints while maintaining uninterrupted airline operations.
The completed project delivered the infrastructure needed to support reliable AVDGS operation, improving aircraft guidance, gate utilization, and overall operational efficiency at some of LAX’s busiest gates.
You can contact our 24-hour electrical service and maintenance department at 818-970-1149 (Off hours). During the working hours, 8:00am to 5:00pm, please call 818-340-0965.