LAX, Terminal 4 Gate Enhancements

Comet Electric completed critical gate infrastructure upgrades within Terminal 4 at Los Angeles International Airport (LAX), enhancing operational reliability and supporting American Airlines’ gate modernization efforts. Our scope included the installation of new potable water cabinets at Gates 46 and 48B, new Ground Power Units (GPUs) at Gates 46 and 46A, and a new Pre-Conditioned Air (PCA) unit and Passenger Boarding Bridge (PBB) at Gate 46.

Additional work included the installation of a new HM door and electrical infrastructure to support HVAC system upgrades associated with the gate improvements. These enhancements improved gate functionality, aircraft servicing capabilities, and overall operational efficiency.

All work was performed during off-hour shifts within an active terminal environment to minimize impacts on airline operations, maintain passenger flow, and ensure uninterrupted gate availability throughout construction.

Project Info

Project Name

LAX, Terminal 4 Gate Enhancements

Category

Completion Date

September 2016

Value

$1.0M

Delivery Method

Hard Bid

Owner

American Airlines

General Contractor

CSA Contractors